Friday, March 18, 2011

What Does A Hard Open Cervix Mean

A WIND FARM AT END OF LIST

The Sierra will have a wind farm located in Aracena

Rufino Javier Moya / Aracena

The Ministry of Environment has given its approval to the application of Unified Environmental Clearance for a new wind farm project in the province of Huelva, specifically located in the town of Aracena. A project with the approval of the Provincial Delegation also Huelva delegate under the rubric of the Environment, Juan Manuel Lopez.

project is called 'Sierra de la Pedrosa II' along the regional road from the town aracenense to Campofrío (beyond the landfill area de Aracena), ie outside the Natural Park Sierra de Aracena y Picos de Aroche, officials said. The Official Journal of the Andalusian today includes the number 55, page 111, the resolution that gives this project a unified environmental clearance.

Since the group Ecologists in Action welcomes the boost to renewable energy development, although claimed to be equipped with a parallel sort order in the territory of such facilities, measuring also its visual impact on the environment.

0 comments:

Post a Comment